1000kW silent rooftop standby for a Singapore commercial complex with strict noise compliance and tiered critical load management.

Challenge
Urban noise limits (75 dB(A) @ 7m), limited roof load capacity, and mixed critical/non-critical loads required tiered ATS shedding and remote radiator routing.
Solution
1000kW rooftop silent generator with remote radiator stack, dual muffler path, and tiered load shedding via ATS panels for lifts, HVAC, and fire pumps.

English
Tiếng Việt
Indonesia
简体中文