500kW mobile rental package keeping a high-rise construction site productive during delayed DEWA grid connection, with refueling and preventive maintenance included.

Challenge
The 52-floor tower site required 400V distribution to tower cranes, batch plant, and site offices while DEWA connection slipped by six weeks. Dust, heat, and weekly relocation between phases demanded trailer-mounted sets with quick-connect panels.
Solution
Two 500kW trailer-mounted Perkins units with synchronized refueling, weekly PM schedule, and 400V output configured for construction loads. Included lockable distribution boxes and fuel consumption reporting for the EPC cost controller.